Pretty standard....
3 banjo burners, one high power under the brew kettle, manual control for propane, PID control for electric.
50amp back to back control panel for electric, runs 2 vessels at a time.
5500w 240v elements for the kettle and HLT, 4500w in the RIMS tube.
Brewers Hardware RIMS tube mounted between mash tun and brew kettle, using Ranco controller
2 March 809 pumps with 815 impellers, one with Chugger stainless head.
2 Blichmann Therminator chillers
Brewers Hardware trub/hop filter canister
Mash Tun has a Sabco false bottom
Inline thermometer and oxygen stone after the chillers
I will weld up similar racks for local folks.
Just added the Stout Tanks 20 Gallon conical and kettle.

50amp, with 3 elements, one in the HLT, Boil, and one in the RIMS tube. PID controllers. It will run any 2 elements at once but with 50A can't have all three at once at least on full, maybe on "maintain." Credit to Kai from The Electric Brewery for most of the guidance.