Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


Messages - bgm1961

Pages: [1]
1
Hello all,

I accidently activated a package of "Wyeast 1272 American II" four months ago. The mfg date is 29 May 12 (5 months, 1 week), and its been stored in the refrigerator all the time. The package is still swollen. I intend to use it for a HALF batch (2.5 gals) of American style Ale.

Question:  Can I get away with simply pitching the ENTIRE package into the half batch, letting the batch size compensate for its age and swollen state, or do I really need to do a starter? I’ll do a starter, but would simply prefer to simply pitch the whole package and call it good.

Of course, what I prefer doesn’t matter if the only viable solution in this situation is to do a starter. I just don’t have enough experience to know yet. The FAQ on the Wyeast website says its OK to delay use on an activated package, but I don’t think they were talking about a four month delay. But their advice is based on a full batch.

Again this wouldn’t even be a question if I was doing a full batch - a starter would be a no-brainer in this situation. But I’m assuming the half-batch size is the key to the answer. Thoughts?

Thanks,
Bgm1961

Pages: [1]