Fridgie being comfortably installed in his new digs it was now time to get the plumbing going. Went to the brew store today and gave my left nut for a bunch of goodies.... 2 Cornies, CO2 bottle, regulator, hoses and barbs, and a pair of through the door taps. Two more trips to the store (one for a bad poppet, one for a bad thread on the tap tail piece) and the whole thing is assembled and being bench tested....... (10 psi, valve off, overnight.) So far so good.
QUESTION.....
I forgot to ask at the store, is that a 5lb CO2 bottle? And, how many 5 gallon kegs can one expect to push with that?

Next is installing the whole lot on fridgie......
Meanwhile I have bought the goodies for the actual brewing process.....(step three) An American pale ale, partial extract kit.....
Sunday is brew day.