Not a commercial operation..... A simple three tier gravity system Still a lot of work to do, but I think you can see where it's going. The neat part about this system is that it hangs from the pipe on the ceiling, and that it will hinge up and out of the way when not in use.......
The grates for the keg and cooler still need to be put in, and they will be lower than the edge of the support creating fiddles. Also still need the burners, waiting for delivery. Plan on puting a copper gas line on, with a flex to the ceiling and then over and down to a 100 pounder. Also plan to run a copper water pipe to the HLT, so al I will have to do is hook up the hose at the bottom....With a shutoff and a sight glass it should be nice and efficient. The cooler platform is large enough to hold a 70 quart cooler, so 10G batches are theoretically possible.